Hit enter to search or ESC to close
Eliminate voltage spikes, cut operating costs, and accelerate production for welding plants, OEMs, and industrial distributors.
Get Free Quote in 24 h1. Over‑priced, low‑quality transformers – 62 % of purchasing managers report paying up to 30 % more for units that fail quality audits.
2. Inconsistent voltage output & frequent downtime – Voltage fluctuations > 5 % cause weld defects, increasing re‑work costs by 18 % on average.
3. Lengthy lead times & poor after‑sales support – Traditional suppliers need 6‑8 weeks for OEM orders, forcing inventory buffers that inflate working capital.
| Parameter | Typical Value | Unit | Compliance |
|---|---|---|---|
| Primary Voltage | 220‑240 | V AC | IEC 61800‑5‑1 |
| Secondary Voltage (Welding) | 10‑30 | kV DC | CE, RoHS |
| Power Rating | 5‑150 | kW | ISO 9001 |
| Frequency | 50/60 | Hz | IEC 60076‑1 |
| Core Material | High‑grade silicon steel | — | VDE‑0470‑1 |
| Operating Temp. | ‑40 ~ +85 | °C | UL 1449 |
| Insulation Class | Class B | — | ISO 14001 |
Automotive chassis welding lines – A U.S. Tier‑2 supplier reduced weld re‑work by 22 % after switching to our 80 kV toroidal transformer, saving $120k annually.
Ship‑yard pipe welding – Our 150 kW high‑voltage unit delivered 99.8 % uptime over 12 months, cutting overtime labor costs by 15 %.
Heavy‑duty equipment manufacturers – Customized winding allowed a 30 % size reduction, enabling tighter equipment enclosures.
Standard OEM orders ship in **14 days** after design approval. Express production (stock cores) can be ready in **3 days**.

Yes. Our 10 R&D engineers work with you to define winding ratios, insulation class, and enclosure style. CAD drawings are delivered within **48 hours** of requirement receipt.
All units are CE‑marked, UL‑listed, RoHS compliant, and meet FCC Part 15 standards for electromagnetic compatibility.
We provide a **12‑month no‑questions‑asked warranty**. Faulty units are replaced within **5 working days**. A dedicated technical support line (24 h) is available for troubleshooting.
We accept T/T (30 % deposit, 70 % before shipment), L/C at sight, and PayPal for samples. For trusted partners, net‑30 days is negotiable.
Limited‑time offer: Free engineering sample (up to 5 kW) for the first 10 U.S. customers – no commitment required.
Request Sample Now Email Sales TeamStocks are limited – act within 7 days to secure your free sample.
Mike D., Senior Engineer – PowerWeld Corp.
“The transformer’s voltage stability is exceptional – we measured a **0.8 % ripple** versus the industry average of 3 %.”
Susan L., Procurement Manager – GreenShip Fabricators
“Fast 48‑hour OEM design saved us a critical project deadline. The after‑sales team resolved a minor wiring issue within **2 hours**.”
Tom H., Technical Director – SteelForge Ltd.
“Cost per kW dropped by **27 %** after switching to Xinchangda’s toroidal design – a clear ROI within 4 months.”
Trusted By Industry Leaders
large-toroidal-transformer toroidal-power-transformer use-of-transformer-in-welding Push-Pull-Toroidal-Electronic-High-Frequency-Transformer
John M., Operations Manager – WeldTech USA
“Switching to Xinchangda’s toroidal transformer cut our welding‑line downtime by **18 %** and saved **$45 k** in the first quarter. The 48‑hour OEM design turnaround was a game‑changer.”
Lisa K., Procurement Lead – MarineCo Industries
“The quality‑first approach (ISO 9001, CE, RoHS) gave us confidence to place a $1.2 M order. Delivery arrived in 12 days – well ahead of the 6‑week promise from competitors.”
Certificates & Compliance: CE, FCC, GS, CB, RoHS, VDE, SAA, ISO 9001, IEC 61800‑5‑1, UL 1449, ISO 14001.