Hit enter to search or ESC to close
Eliminate unbalanced loads, reduce energy loss, and accelerate commissioning – the ultimate solution for Purchasing Managers, Technical Directors, and Operations Leaders in the USA.
Get Free Quote in 24 h1. High Energy Losses & Unbalanced Loads – In a delta‑connected system, neutral current is absent, causing voltage imbalance that can raise operational costs by up to 15 %.
2. Complex Wiring & Installation Errors – Incorrect phase sequencing leads to motor reverse rotation, warranty claims, and up to 30 % downtime during start‑up.
3. Unpredictable Maintenance Costs – Over‑heated windings and harmonic distortion increase service tickets, averaging $12,000 per incident for mid‑size plants.
4. Regulatory Compliance Pressure – IEC 61800‑9‑1 and UL 508A require documented neutral grounding and harmonic mitigation for three‑phase wye setups.
5. Lead‑time Uncertainty – Traditional suppliers in China quote 8‑12 weeks, jeopardizing project schedules.
See How We Solve These Issues →| Parameter | Standard Model | Custom Range |
|---|---|---|
| Rated Power (kVA) | 10 – 500 | 5 – 2000 (OEM) |
| Primary Voltage (V) | 380/400/415 | 220 – 690 |
| Frequency (Hz) | 50 / 60 | 45 – 65 |
| Efficiency (%) | ≥ 98.5 | ≥ 98.0 |
| Insulation Class | B / F | A / B / F (as required) |
| IP Rating | IP20 | IP20 – IP65 |
3-phase-circuit-breaker Delta-wye-transformer-connection Wye-vs-delta-transformer Power-supply-with-relay
A wye (Y) connection ties each phase to a common neutral point, providing a stable reference voltage, reduced line currents, and the ability to run both 3‑phase and single‑phase loads from the same transformer.
Yes. Our OEM/ODM team can tailor primary/secondary voltages (220‑690 V), IP ratings (IP20‑IP65), and mounting options to meet your exact specifications.
Standard models ship in 10‑14 days; custom designs are delivered within 4‑6 weeks after final engineering approval.
We offer remote commissioning assistance, detailed wiring diagrams, and optional on‑site training by our certified engineers (additional fee).
All units undergo third‑party testing, receive CE/UL marks, and are accompanied by a full test report and a Declaration of Conformity.

We provide a 24‑month warranty, free technical hotline, and spare‑parts inventory in the USA for rapid replacement.
Limited‑time Offer: Free engineering sample (up to 5 kVA) + 30‑day money‑back guarantee.
Request Free Sample NowOr call us directly: +1 (800) 555‑0199 (US toll‑free) | WhatsApp: +86 131 2825 6415
Linda Torres, Operations Manager, GreenEnergy Corp. – “The wye transformers arrived ahead of schedule, and the power quality improvement was measurable within 48 hours. ROI realized in 4 months.”
Mark Patel, Procurement Lead, AeroTech Solutions – “Xinchangda’s OEM flexibility let us meet a unique 750 kVA spec without extra tooling costs. Their technical team was proactive and responsive.”
Sarah Liu, Facility Engineer, MedEquip USA – “Compliance documentation was flawless; we passed FDA electrical safety audit on the first attempt, saving us weeks of delay.”
Trusted by Global Leaders
Certificates & Standards: CE, UL, FCC, GS, CB, RoHS, VDE, SAA, ISO 9001, HACCP/GMP, IPPC.
Got Questions? →