Hit enter to search or ESC to close
Eliminate costly downtime and reduce energy spend – the ultimate power partner for operations managers, technical directors, and purchasing teams.
Get Free Quote in 24 hIn 2025, 30 % of US factories reported > 5 % of total operating expenses tied to unreliable power sources. The most common pain points you face are:
These issues translate into an average **$250,000** annual loss per 5,000‑square‑foot facility. What if you could cut that loss by up to 37 %?
| Model | Capacity (Ah) | Nominal Voltage (V) | Cycle Life (at 80 % DOD) | Operating Temp (°C) | Certifications |
|---|---|---|---|---|---|
| EX‑5000‑L | 5000 | 48 | 2500 | -30 to +55 | UL, CE, FCC |
| EX‑3000‑Li | 3000 | 24 | 4000 | -20 to +60 | UL, RoHS, VDE |
| EX‑2000‑Hybrid | 2000 | 12 | 3000 | -25 to +55 | ISO 9001, GS, CB |
Our systems power a wide range of US industrial environments:
Q1: What is the typical procurement lead‑time for US orders?
A: Standard stock ships within 48 hours. Custom OEM/ODM projects average 10‑14 days from final design approval.
Q2: Can Exide systems be integrated with existing BMS platforms?
A: Yes. Our packs support Modbus, CAN‑bus, and proprietary APIs, allowing seamless data exchange with most SCADA systems.
Q3: Are there volume discounts for large‑scale deployments?
A: Tiered pricing starts at 5 % discount for orders ≥ 10 kWh, scaling up to 18 % for ≥ 100 kWh.

Q4: How does Exide ensure compliance with US safety regulations?
A: Every unit undergoes UL 1973 and UL 9540 testing, and we provide full certification packages for audit trails.
Q5: What after‑sales support is available?
A: 24/7 technical hotline, on‑site installation assistance (within 48 hours of request), and a 5‑year warranty covering performance degradation.
Q6: Is financing or leasing an option?
A: We partner with leading equipment‑finance firms to offer lease‑to‑own programs with zero‑interest for the first 12 months.
Limited‑time offer: **Free performance analysis** and a **sample pack** shipped within 48 hours. No commitment, no risk.
Email Quote Now WhatsApp Chat
Mark T., Purchasing Manager, SolarTech USA
“The 24‑hour delivery saved our project deadline. Energy cost dropped 28 % after installing Exide’s lithium‑ion packs.”
Emily R., Supply Chain Lead, MedEquip Corp.
“Compliance was a nightmare until Exide provided full UL & ISO documentation. Audits are now a breeze.”
James L., Technical Director, AutoFab Inc.
“Custom OEM design matched our 48 V CNC requirements perfectly—no retro‑fit needed, saving us $45 k.”
Trusted by Global Leaders
All products are fully certified (CE, FCC, UL, RoHS, VDE, GS, CB, ISO 9001, HACCP/GMP, IPPC). Compliance documentation is provided on request.