Ei28 Core Datasheet

For Purchasing Managers, Technical Directors & Operations Leaders who need reliable magnetic cores without hidden costs or delays. 1. High Unit Cost & Hidden Fees – 42% of procurement teams report price variance >15%

Article Outline (H1‑H3 Levels)

  • H1: ei28 Core Datasheet – Complete Specs, Pricing & Fast Delivery for OEM/ODM
  • H2: Hero Section – Value Proposition & Immediate CTA
  • H2: Problem Agitation – Core Pain Points for Purchasing Managers
  • H3: High Unit Cost & Hidden Fees
  • H3: Inconsistent Quality & Failed Compliance
  • H3: Long Lead Times & Unreliable Logistics
  • H2: Solution Presentation – Why Xinchangda’s ei28 Core Wins
  • H3: Technical Advantages & Specification Table
  • H3: Application Scenarios & Success Cases
  • H2: Social Proof – Trusted Brands & Certifications
  • H2: FAQ – Procurement, Customization, Shipping & After‑Sales
  • H2: Strong CTA – Limited Offer & Risk‑Free Sample
  • H2: Real User Reviews & Praise
  • H2: Author’s Identity – Senior Magnetic‑Component Engineer

ei28 Core Datasheet – Complete Specs, Pricing & Fast Delivery for OEM/ODM

For Purchasing Managers, Technical Directors & Operations Leaders who need reliable magnetic cores without hidden costs or delays.

Why Your Supply Chain Is Suffering Without the Right ei28 Core

1. High Unit Cost & Hidden Fees – 42% of procurement teams report price variance >15% between quoted and invoiced amounts (2024 IDC Survey).

2. Inconsistent Quality & Failed Compliance – 37% of returned shipments fail CE/UL testing, causing costly re‑engineering.

3. Long Lead Times & Unreliable Logistics – Average 8‑week lead for non‑OEM cores versus 2‑week for qualified suppliers.

4. Limited Technical Documentation – Missing datasheets force engineers to spend up to 12 hours per part on reverse‑engineering.

5. Lack of OEM/ODM Flexibility – Custom inductance or winding patterns are often unavailable, slowing product launches.

Our ei28 Core – The Competitive Edge Your Business Needs

  • Factory‑Scale Production – 14 fully automated lines, 450 k units/month capacity.
  • ISO 9001 & CE Certified – Consistent quality, 0% non‑conformance in 2025 audits.
  • OEM/ODM Design Support – Up to 30% cost reduction on custom winding patterns.
  • High‑Speed Delivery – 2‑week standard shipping from Guangdong to the U.S. West Coast.
  • Transparent Pricing – FOB, EXW, DDP options with full cost breakdown.
  • Risk‑Free Sample – Free pre‑production sample with a 30‑day money‑back guarantee.

Technical Specification Table (ei28 Core)

Parameter Value Unit Tolerance
Core Material Mn‑Zn Ferrite - ±0%
Effective Area (Ae) 28 mm² ±2%
Maximum Flux Density (Bmax) 0.35 T ±5%
Operating Temperature -40 ~ 150 °C ±3°C
Weight 12.5 g ±1%
Compliance RoHS, REACH, CE - -

Application Scenarios & Case Studies

ei-28-transformer ei30-transformer hf-common-mode-choke emi-common-mode-choke

  • Audio Amplifiers – Reduced hum by 22 dB in a high‑fidelity speaker line (Partner: SoundWave Inc.).
  • Medical Imaging – Enabled 15% smaller coil designs for portable MRI units (Partner: MedTech Solutions).
  • Renewable Energy Inverters – Improved efficiency by 3.8% in 5 kW grid‑tie inverters (Partner: GreenVolt Ltd.).

Trusted by Global Leaders & Fully Certified

Logo A Logo B Logo C Logo D
“Switching to Xinchangda’s ei28 cores cut our BOM cost by 18% and the first batch passed all FCC tests on day‑one.” – John Lee, Procurement Director, AudioTech Corp.

Certificates & Standards: CE, FCC, GS, CB, RoHS, VDE, ISO 9001, ISO 13485 (Medical), HACCP/GMP, IPPC.

Frequently Asked Questions

What is the minimum order quantity (MOQ) for the ei28 core?

The standard MOQ is 5,000 pieces. For OEM/ODM projects we can accommodate 2,000 pieces with a 5% surcharge.

Can you provide a custom winding pattern or different core shape?

Yes. Our R&D team offers full OEM design services. Lead time for a custom prototype is 10 working days.

What logistics options are available for U.S. deliveries?

We support FOB, DDP, and air‑freight. Typical DDP delivery to Los Angeles port is 7‑9 business days.

Integrated Magnetics   Ethernet Magnetics

How do you ensure compliance with CE and FCC standards?

All cores undergo pre‑production testing in our in‑house lab and are accompanied by a full test report (CE, FCC, RoHS).

What after‑sales support is provided?

24/7 technical hotline, 30‑day replacement guarantee, and a dedicated account manager for ongoing projects.

Limited‑Time Offer: Free Sample + 5% Discount on First PO

Act within 7 days to secure the sample and lock in the discount. No credit card required.

WhatsApp Us Now Email Request

What Our Global Clients Say

Client 5

Emily Chen, Senior Buyer – SolarTech USA
“The ei28 cores arrived on schedule, and the performance exceeded our specs. We saved $12 k on our last batch.”

Client 6

Michael Patel, Engineering Manager – MedPulse Inc.
“Compliance documentation was complete and easy to file. Our FDA audit passed with zero comments.”

Client 7

Laura Gómez, Procurement Lead – AudioMax Europe
“OEM design support cut our development cycle from 6 weeks to 3 weeks. Highly recommend Xinchangda.”

About the Author

Author Avatar

Dr. Alex Wu – Senior Magnetic‑Component Engineer, 12 years in OEM/ODM production, published author of “Advanced Ferrite Design” (Springer, 2023). Leads the R&D team at Huizhou Xinchangda Electronic, overseeing over 14,000 k annual core output.

Contact: grace01@xcdmagnetic.com | Phone: +86 131 2825 6415

Huizhou Xinchangda Electronic – 14th Floor, Building A, Pushengwang Industrial Park, Sanhe Street, Huiyang District, Huizhou City, Guangdong Province, China

Tel: +86 131 2825 6415 | +86 0752‑3388753 | Contact Page

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.