Hit enter to search or ESC to close
Eliminate high price & low‑quality risks while accelerating your product launch.
Get Free Quote in 24 h1. Excessive Unit Cost – Most suppliers charge 15‑25% above market average, eroding your margin.
2. Unreliable Performance – Inconsistent output voltage leads to flicker, shortened lamp life, and costly warranty claims.
3. Lengthy Lead Times – 8‑12 weeks from order to delivery stalls production schedules.
4. Limited Customization – Fixed specs prevent integration into compact LED backlight modules.
5. Compliance Uncertainty – Missing UL, FCC, or RoHS certifications jeopardize market entry.
Result: You face delayed launches, higher OPEX, and lost market share.
See How We Solve It| Parameter | Typical Value | Tolerance |
|---|---|---|
| Input Voltage | 85‑265 V AC | ±5% |
| Output Voltage | 30‑120 V DC | ±2% |
| Frequency | 20‑150 kHz | ±10% |
| Power Rating | 10‑200 W | ±5% |
| Operating Temp. | ‑40 °C ~ +85 °C | – |
| Efficiency | ≥92% | – |
LED Backlight Modules – A US‑based monitor manufacturer reduced unit cost by 18% and cut power draw by 13% after switching to our custom 120 W CCFL inverter transformer.
Medical Imaging Equipment – Our transformer met UL‑60950‑1 and ISO 13485 standards, enabling a rapid 4‑week market entry in the California market.
Automotive Interior Lighting – With a 2‑week lead time, the OEM integrated a compact 30 W design, shortening the vehicle assembly line by 3 days.
Download Full Technical Brochure (PDF)Q1: What is the minimum order quantity (MOQ) for standard CCFL inverter transformers?
A: Our stocked models start at 500 pieces. Custom designs begin at 1,000 pieces, with flexible scaling for larger projects.

Q2: Can you provide UL and FCC certification for custom specifications?
A: Yes. All custom units undergo UL 60950‑1 and FCC Part 15 testing. Certification reports are supplied with each shipment.
Q3: What is the typical lead time for an OEM order?
A: 5‑7 working days for stocked inventory; 10‑14 days for engineered prototypes; 2‑3 weeks for full‑scale production after design approval.
Q4: Do you offer design assistance for power factor correction?
A: Our 10 R&D engineers can co‑develop PF‑optimized topologies, achieving power factor >0.95 in most applications.
Q5: What are the payment terms for first‑time US buyers?
A: 30 % T/T deposit, 70 % against B/L, or L/C at sight. We also accept PayPal Business for orders under $5,000.
Q6: How do you handle after‑sales support?
A: Dedicated US‑based technical support (email & phone), 24‑hour response SLA, and a 12‑month warranty covering material defects.
Limited‑time Offer: Free engineering sample (up to 5 W) for qualified US purchasers – no charge, no obligation.
Risk‑Free Guarantee: 30‑day money‑back if the sample does not meet your performance criteria.
Contact Options:
Trusted By Industry Leaders
Client Logos: (Insert logos from) Apple, Samsung, Philips, GE Healthcare, Tesla, Dell, Panasonic
Testimonials
Certificates & Compliance – CE, FCC, UL, RoHS, ISO 9001, ISO 13485, VDE, GS, CB, SAA.