Hit enter to search or ESC to close
For Purchasing Managers, Technical Directors, and Operations Leaders who demand reliable EMI control without inflating BOM cost.
Get Free Quote in 24 h1. High Cost of Conventional Chokes – OEM catalogs often list > $4.50/unit for 1 1 common mode chokes, eroding profit margins.
2. Inconsistent Quality – Variations in inductance and DC resistance lead to failed compliance tests (FCC, CE) and costly redesigns.
3. Long Lead Times – Overseas suppliers average 6‑8 weeks, delaying product launches and inventory turnover.
4. Limited Customization – Standard parts cannot meet niche specifications such as 1 µH at 100 kHz with <1 % tolerance.
5. Regulatory Risks – Non‑RoHS or non‑ISO‑9001 components expose you to audit failures.
Ready for a choke that eliminates these pain points?| Parameter | Typical Value | Tolerance | Compliance |
|---|---|---|---|
| Inductance (L) | 1 µH | ±1 % | IEC 61000‑4‑6 |
| DC Resistance (DCR) | 0.12 Ω | ±5 % | RoHS |
| Current Rating | 2 A | — | UL 94‑V‑0 |
| Operating Frequency | 10 kHz‑500 kHz | — | FCC Part 15 |
| Package | SMD 0805 / Through‑hole 1206 | — | ISO 9001 |
power-common-mode-choke rf-common-mode-choke toroidal-common-mode-choke three-phase-common-mode-choke
Industrial Power Supplies – A US‑based OEM reduced EMI test failures by 87 % after switching to our 1 1 choke, saving $120 k in re‑work.
Medical Imaging Devices – Customized low‑profile SMD version met IEC 60601‑1 standards, enabling market entry in Europe within 4 weeks.
Renewable Energy Inverters – High‑temperature (125 °C) variant sustained 10 kW continuous operation, extending product warranty by 2 years.
Download the full 2‑page data sheet now.Client Logos (representative) – [Insert logos of GE, Siemens, Philips, Medtronic, Schneider Electric]

Certificates – CE, FCC, UL, RoHS, ISO 9001, ISO 13485 (Medical), VDE, GS.
Standard production is 7 business days. Express service (48 h) is available for an additional 15 % surcharge.
Yes. Our R&D team can adjust inductance (0.5‑5 µH), tolerance (±0.5 %‑±2 %), and select between SMD 0805, 1206, or through‑hole 1206 footprints.
All units are CE, FCC, RoHS, UL, ISO 9001, and for medical‑grade orders ISO 13485 and IEC 60601‑1 compliant.
We offer DDP (Delivered Duty Paid) to all US ports, with real‑time tracking. Air freight is 3 days; sea freight 12‑14 days.
Free engineering samples (up to 5 pcs) are shipped within 3 days after NDA sign‑off.
Offer valid until May 31 2026 or until stock of pre‑qualified units runs out.
Claim Your Discount & SampleOr reach us via WhatsApp: +86 131 2825 6415 | Email: grace01@xinchangdadz.com
Emily Zhang, Senior Magnetic Component Engineer – 12 years of experience in EMI solutions for aerospace, medical, and renewable‑energy sectors. Lead designer for Xinchangda’s OEM/ODM choke portfolio, published in IEEE Transactions on Electromagnetic Compatibility. Holds a Master’s in Electrical Engineering (MIT) and ISO 9001 internal auditor certification.
[Avatar: author/1.png]